1991 Berlin, Reichstag Building

In 1991 the Bundestag passed the resolution to use the Reichstag building for parliament. The dome which was at a later stage designed to be accessible by the public had to be separated elastically from the building.

Calenberg Ingenieure designs, manufactures and markets elastomeric sliding bearings, and statically or dynamically loaded structural bearings (elastomeric bearings) for buildings and structures, sub-ballast mats and trackbed mats for track construction as well as other elastomer-based products for noise insulation and environmental protection.

Calenberg bi-Trapez Bearings® and Sandwich Bearings were used in this case. The dome has become a great attraction of Berlin.

Calenberg Ingenieure designs, manufactures and markets elastomeric sliding bearings, and statically or dynamically loaded structural bearings (elastomeric bearings) for buildings and structures, sub-ballast mats and trackbed mats for track construction as well as other elastomer-based products for noise insulation and environmental protection.
Web Design by elf42
webdesign by elf42